Successful Greywater projects include the following elements: 1. The project has a favorable Return on Investment (ROI), 2. A wastewater stream characterization was completed, 3. Based on item two, suitable recover and storage equipment was chosen, 4. Based on item two, suitable treatment equipment and piping was chosen, and 5. The system design integrated Plumbing Code & Environmental Regulations including protection, monitoring and regulatory reporting.
Copyright ©2010 Practical Applications, Inc. | 12 Channel St. Boston, MA 02210 | Tel: 617-423-5639 | Fax: 617-423-9341