If you are a current MA Wastewater Operator and need to change your status (active, inactive, etc.), please download the form below, or view our Training Page for more information. Wastewater Operator Status Change Download this PDF to change your operator status.
This article was written by Practical Applications’ biologist Kimberly Baxter and originally appeared in the December 2005 issue of Plumbing Engineer magazine. A PDF of the article is available HERE. Abstract An assessment of sampling locations for three industrial wastewater effluent piping systems is presented. The assessments provided demonstrate that by installing sampling ports at the appropriate...
Practical Applications, Inc. will be conducting a TCH Course at the Bayer (Siemens) Walpole facility on Wednesday, April 8, 2009. This course, worth 8 TCH’s, will feature a tour of the facility, hands-on projects, and presentations. Why Two Tanks – A Back to Basics review of Two Tank pH Neutralization Systems Mechanics and Process Control Strategy ...
Josh Jondro – Chemical Engineer Wastewater Management Team As discussed in the August Newsletter, a Fully Automated Industrial Wastewater Pretreatment System will shutdown and temporarily holds wastewater for proper treatment if an out-of-spec condition, an excursion, is detected. These systems require checks only twice a week and an operator on-call. All other systems require a daily operator...
Thanks for all your help in getting my Wastewater Operator certification. The class content was applicable to the state exam and I felt thoroughly prepared to take it.
Christian Heath
Copyright ©2010 Practical Applications, Inc. | 12 Channel St. Boston, MA 02210 | Tel: 617-423-5639 | Fax: 617-423-9341